Al Furat
Manufacturing Facility, Iraq Posted 5/4/2006
Construction of the building depicted on this graphic was suspended in 1991.
Construction resumed in 2001, and the building appears to be operational,
although the tall section at the rear of the building has not been completed.
The building was originally intended to house a centrifuge enrichment cascade
operation supporting Iraqs uranium enrichment efforts. |